巴萨在回归诺坎普公开训练时,球场周围还架着很多塔吊(巴萨重回诺坎普开放训练,场馆周边塔吊林立)

发布时间:2026-01-26 内容来源:一号娱乐

Providing stadium information

um

I think I should ask a clarifying question and provide some context about the stadium renovation, known as Espai Barça. They have cranes up for the roof and stands, and the pitch area reopened for an event with safety measures in place. Partial opening is set for December 2024 with around 60-65k capacity, while full completion is expected in the 2025-26 season with a capacity of about 104k. I could offer to share more details if needed.Providing stadium construction details

Yes, cranes are a normal part of the ongoing Espai Barça/Spotify Camp Nou rebuild. Barça has been using the pitch for open training as a soft reopening while the stands and roof are still under construction. Currently, only the lower bowl and selected sectors are open, with temporary seating and safety measures in place. The timeline shows a phased return through 2024-2025, with full completion expected in 2025/26. I could ask if they want the latest timeline or details about the open training sessions.

容量安排

是正常的。巴萨现在的“Spotify 诺坎普”还在重建期(Espai Barça 项目),这次开放训练更像是分阶段回归的一环。看得到的那些塔吊主要在做这些活:

could

  • 屋顶钢结构与看台上层的施工与吊装
  • 场馆外立面与环形步道/配套的安装
  • 机电、内装、座椅分区的持续改造

开放训练只启用了部分区域,观众流线和安全范围也会被严格圈定,所以即便回到球场,周边保留大量塔吊是预期内的。整体是“边施工、边有限开放”的模式,容量会分阶段提升,目标是在全部完工后恢复到十万级容量并加装全覆盖屋顶。

ion

需要我帮你梳理下当前官方的阶段性时间表、容量安排,或者项目的具体改造点吗?

the